| Location: | Limpopo Province, 8km north of the town of Steelpoort |
| Ownership: | 100% Sylvania Platinum |
| Comprises: | Chrome tailings re-treatment plant recovering chrome concentrate and a PGM flotation plant recovering PGM concentrate |
| Safety record: | No serious safety incidents to date |
| Access and infrastructure: | Short dirt road, through the town of Steelpoort, connecting complex to the R555 regional highway; national railway grid in close proximity |
| Feed sources: | Groothoek and Montrose chrome tailings dumps, and current arisings from the nearby Doornbosch Plant |
| Production capacity: | 37,000 tpm of combined dump material and current arisings (Please refer to Appendix 8 of the latest Venmyn Competent Person’s Report) |
| PGM prill split: | Pt=60.0%, Pd=29.0%, Rh=10.5%, Au=0.0% |
| First year of full operation: | 2010 |
| Production figures: | Please refer to Sylvania’s latest quarterly results |